Cupertino High School

New Two-Story Science Laboratory & Classroom Buildings

Cupertino, CA

To support the need for new program space and growing enrollment at Cupertino High School (CHS), Fremont Union High School District (FUHSD) embarked on a project to replace an outdated and inefficient single-story classroom building and maximize the real estate of the under-utilized space on which it stood. The District started with a conventional custom-designed building, but QKA’s Folia building solution was ultimately chosen because it accomplished Cupertino’s program needs while being more cost-effective.

Two, two-story, L-shaped Folia classroom buildings and one two-story custom science lab building leveraging Folia system efficiencies, were proposed. Together, the buildings include 22 classrooms, a makerspace, and six state-of-the-art 1,600 square feet science labs, all connected via balconies and arranged around an outdoor courtyard, ideal for additional collaboration space.

This project quickly took shape and was completed a full school year earlier than had FUHSD embarked on a traditional, site-built custom construction project. The result has provided the students and faculty at CHS with an optimal 21st century teaching & learning environment.

Making a Difference
Utilizing the Folia prefabricated building system allowed Cupertino High School to add a multitude of new state-of-the-art, flexible spaces, including 22 classrooms, a makerspace and six science labs, supporting project-based and collaborative learning.
"The Folia classroom building was the perfect solution to both our budgetary and classroom capacity problems. The building was constructed in just 12 months at 85% of the cost of a traditional building. This project completely transformed the school by replacing the most poorly utilized building on campus with 29 beautiful, state-of-the-art classrooms."
- Graham Clark, Associate Superintendent, Fremont UHSD

School District
Fremont Union High School District

Size
40,300 sq.ft. (New Construction)

Completion Date
February 2018

Final Construction Cost
$26.9M

Features

High School
New Construction
Folia
Classrooms
Science Lab
Makerspace

Awards

2019 Green Leadership Award | Green Technology

2018 Industry Award – Most Innovative Project | American Society of Professional Estimators (ASPE)

2018 Structures Award for Innovation | Silicon Valley Business Journal

2018 Merit Award | American Institute of Architects (AIA) – Redwood Empire